So I started getting ready for framing but I needed to plum for the shower supply lines. Then I realized that If I start putting drywall and the shower waterproofing up and had a leak I would be in trouble. So because of time constraints, I'll have to get the water all setup tomorrow. Then I can leak test and then frame in everything. I'll have to go run water lines under the house, up a wall, and into the bathroom. I also have to tie in the water heater and the washer and dryer. I did the water heater last week but I've included a picture. It looks funny because I don't have the new water lines in.